Indonesia - Taman Industri Ngoro Indonesia
Ngoro Industrial Park (NIP) is strategically located at the base of Mount Penanggungan, Mojokerto Regency, East Java Province, covering an expansive area of 480 hectares. The park’s inception dates back to the first phase development in January 1991, led by PT Dharmala RSEA Industrial Estate—an alliance between PT Intiland Sejahtera (Intiland Group, Indonesia) and RSEA Engineering Corp (Taiwan). Subsequently, the second phase development, initiated in August 2010 and spanning 265 hectares, was overseen by PT Intiland Sejahtera.
Versatile Industrial Options: Land and Facilities
Within NIP Industrial Estate, investors can explore various industrial opportunities, including industrial land, Export Processing Zone (EPZ), and the option to lease factory buildings and warehouses. The EPZ not only provides industrial land but also allows investors to apply for independent EPZs tailored to their specific requirements. Warehouse and factory building options range from 966 m2 to 10,000 m2, with the flexibility to accommodate custom-built structures based on investor preferences.
Diverse Global Investors and Industries at Ngoro Industrial Park
NIP attracts a diverse array of global investors from countries such as Indonesia, Japan, Singapore, South Korea, Taiwan, the USA, France, China, Malaysia, and Thailand. The industrial landscape at Ngoro is bustling with various sectors, including Food & Beverages, Auto parts, Bags (Paper & Plastic), Ceramic Tile, Chemical Products, Food Processing, Hygienic Products, Jewellery, Musical Instrument, Tobacco Processing, Wood Working, Wooden Products, and Sanitary Ware. Renowned investors such as Toyota Astra Motor, Yakult Indonesia Persada, Uni-Charm Indonesia, and others have found a home at NIP, contributing to the park’s international business vibrancy.
Additional Details for Ngoro Industrial Park
- Total area: 480 hectares
- Natural gas: Natural gas provided by PT. PGN (state-owned company) and PT. Pertagas / PT. Dharma Pratama Sejati
- Wastewater treatment: Central Waste Water Treatment Plant
- Seaport: Tanjung Perak seaport (50 km)
- Airport: Juanda airport (50 km)
- Ready built factories: available from 966 sqm to 10,000 sqm. Custom-built factory building or warehouse can be built to suit the investor requirement.