Pinthong Industrial Estate 5

One of the newer additions to the Pinthong stable. This location is directly on the Highway 19 with access to the main ports and airports in Thailand.

Additional Details

  • Total area: 232 hectares (1,450 rai)
  • Electricity supply: Substation 2×50 MW Voltage 22-115 KV
  • Wastewater treatment: 2,500 cu.m./day (expendable) 
  • Water supply: 4,000 cu.m./day (expandable)
  • Internal road system: 4 lanes (30 m width) Secondary Road 2-4 lanes (16-24 m width)
  • Seaport: Laem Chabang Deepsea Port 28 km